T1 Installation Pictures: Life Like SD60, GP30, GP9, GP7

P2K SD60

Below is installation guide for the the P2K harness. Steps are identical for all P2K locomotives.

1.  Unplug DCC socket board and remove two screws securing light board.  Remove light board from locomotive; it is not needed.

2.  Turn DCC socket board over so that sockets face up.  Use one of screws removed from the light board to secure DCC Socket to frame.  See below.

*Important Note* 
Locomotive light bulbs must also be replaced.  We recommend 14 volt bulbs because they do not get as hot as 12 volt bulbs.

3.  Plug decoder into 9-pin plug.  Next, plug the harness with the decoder into the 8-pin NMRA DCC socket. 

Notice how a screw is used to secure DCC socket board with sockets facing up.

Installation of decoder and P2K harness is now complete!

Installations Home Decoder What's New Literature TCS Dealers Warranty TCS Harnesses Dealer Application Contact Us FAQ Order Page

Entire contents © Copyright Train Control Systems 2003-2007 • Last Modified: October 31,  2004